Case Studies
New CCTV hub at Blackburn with Darwen Council case study
SecurityPROJECT OVERVIEW In a bid to crack down on crime across East Lancashire, a new CCTV hub has been created at King George’s Hall, Blackburn. As part of the 24-hour monitoring station, which came into operation in February 2017, Thinking Space was tasked with providing control room furniture, including 2 x two operator control room […]
Read moreMalta International Airport case study: new radar consoles
Air traffic controlPROJECT OVERVIEW Malta International Airport case study: new radar consoles Due to a requirement for a new ATM system to be installed by Malta Air Traffic Services (MATS), radar consoles for nine operator positions within the OPS room were required. The project involved some extensive planning due to the need for a “shadowing phase,” where […]
Read moreProcess monitoring control console for showroom case study
Plant and processPROJECT OVERVIEW Process monitoring control console for the showroom at Flexitricity case studyFlexitricity, a pioneering demand-side response company, recently moved into new custom-designed offices in the heart of Edinburgh, giving rise to the requirement for a brand new control room. Thinking Space took on the challenge and delivered a beautiful, modern space that not only […]
Read moreCase Study: Control Room Furniture for Bristol Operations Centre
Emergency servicesPROJECT OVERVIEW The Bristol City Council has created a state-of-the-art operations center, housing the council’s emergency control center, traffic control centers, and community safety (CCTV) control rooms, together in a single space, which was officially opened in October 2017. Thinking Space worked with consultants and interior designers to manufacture 42 consoles for the new control […]
Read moreProcess control room furniture for Bombay Sapphire case study
Plant and processPROJECT OVERVIEW The Bombay Sapphire Distillery in Laverstoke, Hampshire, were looking to upgrade the existing office furniture in their process control room. After visiting the Thinking Space website, Thinking Space were tasked with designing and manufacturing two control desks for two operators each, a media wall with storage and extra […]
Read moreCase Study: Control Room Furniture for Hampshire County Council
SecurityPROJECT OVERVIEW In our Case Study Control Room Furniture for Hampshire County Council, the story starts with Hampshire County Council’s lease expiring on their previous premises. The Traffic & Travel Information Centre (TTIC) therefore moved into a brand new control room within the council’s main building, at The Castle, in Winchester city centre. The new control […]
Read moreCase Study: Security Control Room Furniture for Royal Botanic Gardens Kew
SecurityPROJECT OVERVIEW The security control room at Kew Gardens required a complete refurbishment to update security equipment which had been in place since the early 1980s. As part of the refurbishment project, 120 analog CCTV cameras were replaced with Hikvision IP cameras, and old CTR screens replaced with large flat screen monitors for live viewing. There […]
Read moreProcess control room furniture for EMR Golden Grove Australia case study
Plant and processPROJECT OVERVIEW The intent of the https://emrgoldengrove.com/">EMR Golden Grove control room upgrade project was to improve the original circa 1990 control room layout to a newer, modern design that better suited the current and future operational requirements. This included improving ergonomics and functionality, and thus to promote a more effective environment for monitoring and controlling […]
Read moreChesterfield CCTV control room relocation case study
SecurityPROJECT OVERVIEW The Chesterfield Borough Council was looking to modernize their CCTV control room and expand their services. This involved the relocation of their existing CCTV control room from a Grade II listed building, built in the 18th Century, to the town hall basement which was being renovated. New control room furniture was required to […]
Read moreBSR group monitoring control room case study
Plant and processPROJECT OVERVIEW In this case study British Solar Renewables (BSR) Monitoring Control Room; Clients’ BSR were looking to relocate the O&M power generation monitoring room at their premises in Somerset. A complete refurbishment of the existing control room and area proposed for the new control room was required. This included modifications to lighting, power, data and decoration; […]
Read moreNew Mansfield ARC control room case study
SecurityPROJECT OVERVIEW A new ARC control room for Protect-Us Monitoring was being accommodated in a brand new building and needed control room furniture. Thinking Space manufactured and installed three two-person consoles along with an extensive media wall and storage furniture to complete the new facility. CLIENT OVERVIEW Protect-Us Monitoring is an accredited remote monitoring station. […]
Read moreBridlington CCTV control room relocation case study
SecurityPROJECT OVERVIEW The existing CCTV control room was to be relocated into a new room within the East Riding council offices in Bridlington. After its refurbishment, Thinking Space provided two curved control room consoles, both height-adjustable and positioned to give the appearance of one long console. These are centered around a curved media wall spanning […]
Read more