The final monitoring room design locates a 3 row Evolution media wall, mounting six large flat screens in a 3 x 2 configuration, and six smaller screens across the top of the configuration. A console for two operators is positioned immediately in front of the media wall, and provides separate height adjustment for each operator. A further height adjustable console for one operator is also provided in the room, alongside an interactive white board to be used together. As well as providing the furniture, Thinking Space employed their trusted team of subcontractors to refurbish the existing and new control room and project manage the works. Lighting, decoration work, air conditioning, power and data modifications were all undertaken as part of the project. Key benefits for the investment in this area was to create a ‘wow’ factor to the operational element of the business and provide a practical and enjoyable working space for the Monitoring Team to work in.