Case Study Process Control Room Furniture for Bombay Sapphire

Case Study Process Control Room Furniture for Bombay Sapphire

PROJECT OVERVIEW

The Bombay Sapphire Distillery in Laverstoke, Hampshire, were looking to upgrade the existing office furniture in their process control room. After visiting the Thinking Space website, Thinking Space were tasked with designing and manufacturing two control desks for two operators each, a media wall with storage and extra storage units. 

Find out more by reading our Case Study Process Control Room Furniture for Bombay Sapphire.

OVERVIEW OF CLIENT

Bombay Sapphire is a brand of gin which was first launched in 1987, and belongs to the Bacardi brand. In 2011, manufacturing moved to a new facility at Laverstoke Mill in Hampshire, UK. This involved redevelopment of a 300 year old paper mill, which has over 1000 years of history with a conservation area as well as a Site of Special Scientific Interest. Thomas Heatherwick was tasked with designing the redevelopment. Of particular note are the two spectacular 15 metre high curved glass houses, which are inspired by the glasshouses at Kew and Crystal Palace. 

At the distillery itself, 2.4 million cases are produced each year, with capacity for an extra million. As well as the distillery, a visitor centre was created which was opened in 2013 and now provides tours of the distillery and grounds, in what’s described as “the Self-Discovery Experience”.  

The process control room is where the monitoring of manufacturing and equipment is undertaken, using state-of-the-art sustainable distilling processes. 

SCOPE OF THE PROJECT

After visiting the Thinking Space website and making an enquiry, Thinking Space were tasked with providing proposals to provide control room desks to suit the layout of the room, and utilise the space more efficiently. The existing control room, which overlooks the manufacturing area, was a challenging space to fill, with simple office furniture in place which was not ergonomic or effective. With windows, doors, and surface-mounted equipment to contend with, Thinking Space provided drawings, including 3D renders to visualise how the furniture would fit within the room. 

PROJECT EXECUTION

Two desks were manufactured, both to accommodate 2 operators at a time. One of the consoles neatly fits into the reveal of a large window overlooking the distillery plant, whilst the other facing into the room affords a curved end panel with the Bombay Sapphire logo displayed.  A two by two configuration media wall with cupboard storage underneath is located along the length of one wall, with extra storage required, a tall tambour door unit neatly fits aside a full length window. Finally, having provided 24/7 furniture to suit ergonomic standards, new 24/7 Mesh Ergohuman chairs were provided. 

Download Case Study

Related Projects

Case Study WhiteTower Energy

Read more
singleton birch control room sm

Case Study Singleton Birch process control room furniture

Read more
bsr-monitoring-control-room-main-image

Case Study BSR Group Monitoring Control Room

Read more
process-control-room-furniture-3-emr-golden-grove

Case Study Process Control Room Furniture for EMR Golden Grove Australia

Read more
flexitricity-process control-room-furniture

Case Study Process Monitoring Control Console for Showroom

Read more
fawley power station

Video Case Study Plant & Process Furniture for Fawley Power Station

Read more
master control room

Case Study Rutherford Appleton Laboratories

Read more